I had put this on hold for a while and sadly the S has been sat under a cover on the drive for a good few months now and I think I need to get these fuel lines sorted now that the weather may be turning better?
I had made up some new fuel lines from cunifer but they got put to one side due to not being able to get the 944 in the garage and the poor weather we've had over the last few months.
This is how far I had got in December
This will be the set up once the cunifer is in line.

Shaping the pipes using the old ones as a template.


So to a question I had when I stripped the old fuel lines out, I pulled the rubber return hose out from the top of the tank sender which didn't come out easily, I removed it because I wanted to replace it with a new hose but when I tried to push a new pipe down the same space it wouldn't go. I also tried a 5mm flexible rod, which I had planned to push through, tape to the new fuel hose and pull through, unfortunately the 5mm rod wouldn't even go through, I think it is catching on something. This is as far as I got in mid December so gave up.
To replace the rubber hose I mentioned above do I need to drop the tank and subframe to give some room? I am going to have another go at this on Sunday as the weather looks okay, so I'm planning what to do in advance and then will see how far I can get?