kongsodoken wrote:
What needs doing

Hey kongsodoken

To get the car complete as far as assembly (and for MOT) - car is in dry storage currently as I'm about to move house so can't wait to get cracking once I've moved!
- Finish assembly of doors - mirrors, glass, window mechanism, handles / locks, speakers / trim
- Seals - check and fit door seals, rear hatch seal, sunroof seal, bonnet seals
- Exterior trim - gutter trim, side trim, stone protection vinyl, badges / logos
- Interior trim - secure carpet and interior switches, check switch wiring, secure rear view mirror to new windscreen (if not already done)
- Check and replace bonnet / rear hatch struts
and I have an ever growing list of jobs I have planned for her after I've completed my house move -
- Change Balance Shaft and Timing Belts (and tensioners)
- Change Oil
- Check thermostats
- Change Coolant
- Change Gearbox Oil
- Fix Power Steering Leak
- Check Steering Rods
- Check Wheel Bearings
- Check Control Arm Ball-joints
- Check Rear Shock Absorbers
- Check CV joints
- Get Brake Calipers Refurbished
- Change Brake Fluid
- Drain Fuel?
- Change Fuel Filter and run some injector cleaner through
- Steam clean chassis? / Power wash
- Underseal (Dinitrol / Bilt Hammer) - Sills, Wheel arches, Chassis
- Aftermarket Boost Gauge
- Aftermarket AFR Gauge
Might start a thread on the reassembly when I get going, kind of like a blog / diary of progress

Thanks!